Eng-Off-Exchange Tower

Exchange Tower

exchange tower

The Project

A thirty-six (36) storey precision quality office tower in the heart of Toronto’s financial district. The building was constructed in the 1980’s and has undergone a number of infrastructure upgrades since original construction.  

Our Role

  • Provided base building mechanical and electrical engineering design services to coordinate Tenant installations.
  • Provided a study to identify, analyze and evaluate different possible condenser water system upgrades.

Our Key Accomplishments

  • Identified three plausible solutions for upgrading condenser for an HVAC system. Collaborating with contractor and building supervisor to determine the most suitable solution.
  • Provides energy consumption monitoring to ensure the continuation of LEED Gold certification.