Eng-Off-2 Bloor St

2 Bloor St E

2 bloor st e

The Project

This 36-storey office tower underwent a major restoration in 2002. That included a new chiller and boiler plant, new air handling equipment, perimeter fan coil units and a DDC control system.  

Our Role

  • Upgraded existing food court exhaust system
  • Provided on-going assistance with leasing and back to base building modifications

Our Key Accomplishments

  • Introduced supplementary cooling to concession units in a cost effective manner
  • Increased kitchen exhaust system extraction capacity to allow a wider variety of tenant installations