Eng-Off-151 Yonge

151 Yonge

151 yonge

The Project

This 18 storey office building is located in Toronto’s downtown core and was built back in 1990.  

Our Role

  • Performed a comprehensive energy audit to identify the breakdown of the building energy consumption
  • Identify a number of measures to reduce energy consumption and improve Tenant comfort
  • Prepared design documents for cooling, heating and outdoor air system upgrades

Our Key Accomplishments

  • Identified measures to minimize electricity consumption by 740,000 kWh
  • Provided no cost, small cost and operational adjustment recommendations that allowed for EPA’s Energy Star qualification with a score of 84